Idiot Eye (Bloom I), 2010
Graphite on decorative paper

Idiot Eye (Bloom I)

Bloom II
Bloom II (detail)

Bloom III
Bloom III (detail)

The Sound of a Drum Played on a Violin
The Sound of a Drum Played on a Violin (detail)

I Am Oscar Grant

Woman I (Camille Pissarro, Avenue de L’Opera)

Daruma II (Jiun)